Miles of Tile!

Image
So much is happening so quickly, I am having to take multiple trips per day to the house to see what is new! March 10, 2019 3:30PM We finished assembling the back steps.  They will hold up to 800 pounds so we will have to go up and down them single file. They had to poke a hole in the beautiful new sheetrock to put in a temporary beam to allow them to get the floating staircase support mounted. March 11, 2019 11:30AM The workers stood on a sagging board while they mounted the stair supports on the floating staircase beam.  I was so afraid it would break and they would fall two stories! The tile installers started putting down the Schluter Ditra tile underlayment.  This is supposed to prevent the tile and grout from cracking. The shower floor and drain in the 2nd floor master was installed. March 12, 2019 9:00AM The Stucco crew showed up in force! Meanwhile, inside, temporary treads had been mounted on the floating staircase. The shower

The Finish Line is In Sight!

Image
We don't think we'll make the end of March (the latest prediction from the builder), but maybe by the end of April, fingers crossed! February 20, 2019 The sheetrock team started putting up the sheetrock! February 21, 2019 The floating stairs were delivered.  It took several men to carry the support beam into the garage. February 25, 2019 I went over to see how the sheetrock installation was going and I found a little visitor in the house!  A tiny screech owl was perched on the wall of the 3rd floor shower! As I got closer, he flew to several windows and then settled himself on top of the step ladder in the guest bedroom. Tony and I tried to get him to fly out a window but he decided to fly into the craft room and hang from a wire. We finally got him to fly out the double doors on the front of the house. February 27, 2019 Drywall mudding and taping was underway. March 4, 2019 Doors and trim were delivered. March 5, 2