Windows to the World!

Image
Things aren't moving quite as quickly as we had hoped.  The original "finish-by" date was mid-November.  Perhaps we should have asked, "What year?"  I am predicting that we'll be in our house by mid-February.  Tony's pessimistic prediction is July 4th. October 18, 2018 The floor beneath the entrance stairs has been poured. This should make a nice wine cellar!  The ladder that had been here had to be moved to the front of the house until the concrete dried. October 19, 2018 The floor of the Elevator Shaft was poured. We met with Terry Hill from Atlantic Companies  to discuss the low-voltage wiring, security system, cables and wi-fi.  With concrete floors, we will have to have wi-fi access points on each floor to be able to get ot the internet from every floor. Concrete was added to the roof to smooth out some of the rough areas in anticipation of waterproofing. This is the area on the roof where the A/C unit and