Posts

Showing posts from May, 2018

Legoland! A house built from styrofoam!

Image
For the longest time, it looked like nothing was happening, but now it is starting to look like a house, albeit a styrofoam house. 4/17/2018 The concrete beams that would support the first living level were poured.       4/21/2018 The beams cured for a few days, then the wood framing was removed.   4/24/2018 More curing for the beams.   Delivery of parts for the Hambro Flooring system.   4/28/2018 Preparing to pour the concrete for the first living level (referred to as the second floor by the builder and architect).  Temporary supports and plywood between the joists were installed.         4/30/2018 It took a few days to get the floor prepared for the concrete to be poured.   I climbed up on what would be our deck to see what our view from the first living level will look like.   5/7/2018 The floor still wasn't quite ready to be poured.  Plastic was laid over the plywood.   5/10