Miles of Tile!

So much is happening so quickly, I am having to take multiple trips per day to the house to see what is new! March 10, 2019 3:30PM We finished assembling the back steps. They will hold up to 800 pounds so we will have to go up and down them single file. They had to poke a hole in the beautiful new sheetrock to put in a temporary beam to allow them to get the floating staircase support mounted. March 11, 2019 11:30AM The workers stood on a sagging board while they mounted the stair supports on the floating staircase beam. I was so afraid it would break and they would fall two stories! The tile installers started putting down the Schluter Ditra tile underlayment. This is supposed to prevent the tile and grout from cracking. The shower floor and drain in the 2nd floor master was installed. March 12, 2019 9:00AM The Stucco crew showed up in force! Meanwhile, inside, temporary treads had been mounted on the floating staircase. ...