Third Floor Walls

You won't really be able to tell much difference in the pictures, but the concrete has been poured into the third floor walls! July 18, 2018 3:14 PM These pictures show the empty 3rd floor styrofoam forms in place and waiting for the pour. July 20, 2018 Our builder advised that a concrete truck came to pour the walls but the pumper truck never showed up, so an entire truck of concrete was wasted. July 23, 2018 12;00 PM The builder told us that the pumper truck and concrete trucks were scheduled for 11:00 AM on Monday. They were late arriving, so we took the opportunity to make the treacherous climb up the ladder to get a peek at the 3rd floor. July 23, 2018 3:21 PM The pumper truck finally arrived, followed by the first of four concrete trucks. The concrete was pumped into the walls in the same manner as before, using the vibrator to make sure that the concrete was distributed to the hard to reach areas under the windows. The n...